|
Item List 051126 |
Date:06/01/2018 |
|
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
| Contract ID | 051126 | Primary Project Number | DE02490040526 |
| Contract Description | E.T. BREATHITT PARKWAY (PW 9004) | ||
| Primary County | CHRISTIAN | Fed/St Number | NH 9004(010) |
| Vendor ID | 00818 | Vendor Name | ROGERS GROUP INC |
| Bid Amount | $ 3,985,000.01 | ||
| SM- Project | DE02490040526 |
| Fed/State Number | NH 9004(010) |
| Project Description | E.T. BREATHITT PARKWAY (PW 9004) |
| *********** |
| SM- Project | DE02490040526 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0010 | PAVE STRIPING-TEMP PAINT-6 IN | 06511 | 25,400.000 |
25,400.000 |
$0.210 |
LF | 0.1 |
| 0020 | PAVE STRIPING-PERM PAINT-6 IN | 06515 | 57,150.000 |
57,150.000 |
$0.280 |
LF | 0.4 |
| 0030 | PAVE STRIPING-THERMO-6 INCH W | 06542 | 29,969.000 |
29,969.000 |
$0.730 |
LF | 0.5 |
| 0040 | PAVE STRIPING-THERMO-6 INCH Y | 06543 | 23,975.000 |
23,975.000 |
$0.730 |
LF | 0.4 |
| 0050 | PAVE STRIPING-TEMP REM TAPE-B | 06549 | 1,200.000 |
1,200.000 |
$3.120 |
LF | 0.1 |
| 0060 | PAVE STRIPING-TEMP REM TAPE-W | 06550 | 4,000.000 |
4,000.000 |
$1.330 |
LF | 0.1 |
| 0070 | PAVE STRIPING-TEMP REM TAPE-Y | 06551 | 54,800.000 |
54,800.000 |
$1.330 |
LF | 1.8 |
| 0080 | PAVEMENT MARKER TYPE IV-BY | 06582 | 1,220.000 |
1,220.000 |
$8.180 |
EACH | 0.3 |
| 0090 | PAVEMENT MARKER TYPE IV-MW | 06580 | 60.000 |
60.000 |
$8.180 |
EACH | 0.0 |
| 0100 | PAVEMENT MARKER TYPE IV-MY | 06581 | 195.000 |
195.000 |
$8.180 |
EACH | 0.0 |
| 0110 | PAVEMENT MARKER TYPE V-B W/R | 06592 | 300.000 |
300.000 |
$24.650 |
EACH | 0.2 |
| 0111 | INSTALL PAVEMENT MARKER LENS | 20755ED | 350.000 |
350.000 |
$19.940 |
EACH | 0.2 |
| 0120 | RESHAPE MEDIAN | 20756ED | 23,975.000 |
23,975.000 |
$3.880 |
LF | 2.3 |
| 0130 | RELOCATE TUBULAR MARKER | 20467NS112 | 125.000 |
125.000 |
$32.360 |
EACH | 0.1 |
| 0140 | REPAIR EXISTING BLOWUP | 03247 | 921.000 |
921.000 |
$131.390 |
SQYD | 3.0 |
| 0150 | PAVEMENT REPAIR | 20757ED | 679.000 |
679.000 |
$115.430 |
SQYD | 2.0 |
| 0160 | REMOVE AND RESET PERF PIPE HEADWALL | 20758ED | 4.000 |
4.000 |
$364.750 |
EACH | 0.0 |
| 0170 | DGA BASE | 00001 | 8,594.000 |
8,594.000 |
$15.520 |
TON | 3.3 |
| 0180 | LEVELING & WEDGING PG64-22 | 00190 | 910.000 |
910.000 |
$45.600 |
TON | 1.0 |
| 0190 | CL3 ASPH SURF 0.50A PG76-22 | 00332 | 8,214.000 |
8,214.000 |
$48.910 |
TON | 10.1 |
| 0200 | CL3 ASPH BASE 1.00D PG76-22 | 00216 | 12,279.000 |
12,279.000 |
$42.860 |
TON | 13.2 |
| 0210 | CL3 ASPH BASE 1.00D PG64-22 | 00214 | 15,590.000 |
15,590.000 |
$37.670 |
TON | 14.7 |
| 0220 | CL2 ASPH SURF 0.50D PG64-22 | 00309 | 3,051.000 |
3,051.000 |
$41.740 |
TON | 3.2 |
| 0230 | CL2 ASPH BASE 1.00D PG64-22 | 00212 | 9,824.000 |
9,824.000 |
$37.530 |
TON | 9.3 |
| 0240 | ASPHALT SEAL AGGREGATE | 00100 | 213.000 |
213.000 |
$47.470 |
TON | 0.3 |
| 0250 | EMULSIFIED ASPHALT RS-2 | 00291 | 26.000 |
26.000 |
$294.920 |
TON | 0.2 |
| 0260 | ASPHALT PLACEMENT WITH MTV | 00338 | 36,043.000 |
36,043.000 |
$1.150 |
TON | 1.0 |
| 0270 | EDGE KEY | 02585 | 76.000 |
76.000 |
$188.260 |
LF | 0.4 |
| 0280 | CL2 ASPH BASE 1.00D PG64-22 EDGE DRAIN CAP | 00212 | 1,167.000 |
1,167.000 |
$40.360 |
TON | 1.2 |
| 0290 | CULVERT PIPE-15 INCH | 00461 | 276.000 |
276.000 |
$70.600 |
LF | 0.5 |
| 0300 | CULVERT PIPE-18 INCH | 00462 | 24.000 |
24.000 |
$76.480 |
LF | 0.0 |
| 0310 | CULVERT PIPE-24 INCH | 00464 | 32.000 |
32.000 |
$82.360 |
LF | 0.1 |
| 0320 | CULVERT PIPE-30 INCH | 00466 | 12.000 |
12.000 |
$117.660 |
LF | 0.0 |
| 0330 | CULVERT PIPE-36 INCH | 00468 | 8.000 |
8.000 |
$129.430 |
LF | 0.0 |
| 0340 | CULVERT PIPE-42 INCH | 00469 | 8.000 |
8.000 |
$152.960 |
LF | 0.0 |
| 0350 | CULVERT PIPE-48 INCH | 00470 | 24.000 |
24.000 |
$164.730 |
LF | 0.1 |
| 0360 | METAL END SECTION TY 3-30 INCH | 01394 | 1.000 |
1.000 |
$2,588.560 |
EACH | 0.1 |
| 0370 | METAL END SECTION TY 3-42 INCH | 01396 | 2.000 |
2.000 |
$3,882.840 |
EACH | 0.2 |
| 0380 | S & F BOX INLET-OUTLET-18 INCH | 01450 | 1.000 |
1.000 |
$2,470.900 |
EACH | 0.1 |
| 0390 | S & F BOX INLET-OUTLET-24 INCH | 01451 | 3.000 |
3.000 |
$2,941.540 |
EACH | 0.2 |
| 0400 | DROP BOX INLET TYPE 1 | 01490 | 3.000 |
3.000 |
$2,941.540 |
EACH | 0.2 |
| 0410 | DROP BOX INLET TYPE 14 | 01577 | 1.000 |
1.000 |
$2,529.730 |
EACH | 0.1 |
| 0420 | REMOVE PAVED DITCH | 02165 | 100.000 |
100.000 |
$10.590 |
SQYD | 0.0 |
| 0421 | CONCRETE-CLASS A | 08100 | 12.800 |
12.800 |
$941.290 |
CUYD | 0.3 |
| 0422 | STEEL REINFORCEMENT | 08150 | 405.000 |
405.000 |
$1.760 |
LB | 0.0 |
| 0423 | REMOVE PIPE | 01310 | 72.000 |
72.000 |
$16.470 |
LF | 0.0 |
| 0424 | REMOVE HEADWALL | 02625 | 17.000 |
17.000 |
$329.450 |
EACH | 0.1 |
| 0430 | CRUSHED AGGREGATE SIZE NO 57 | 00071 | 60.000 |
60.000 |
$21.530 |
TON | 0.0 |
| 0440 | CRUSHED AGGREGATE SIZE NO 2 | 00078 | 127.000 |
127.000 |
$47.060 |
TON | 0.2 |
| 0450 | PERFORATED PIPE-4 INCH | 01000 | 40,180.000 |
40,180.000 |
$5.240 |
LF | 5.3 |
| 0460 | NON-PERFORATED PIPE-4 INCH | 01010 | 3,000.000 |
3,000.000 |
$12.940 |
LF | 1.0 |
| 0470 | INSPECT & CERTIFY EDGE DRAIN SYSTEM | 01015 | 1.000 |
1.000 |
$15,296.030 |
LS | 0.4 |
| 0480 | PERF PIPE HEADWALL TY 1-4 INCH | 01020 | 31.000 |
31.000 |
$441.230 |
EACH | 0.3 |
| 0490 | PERF PIPE HEADWALL TY 2-4 INCH | 01024 | 33.000 |
33.000 |
$470.650 |
EACH | 0.4 |
| 0500 | PERF PIPE HEADWALL TY 3-4 INCH | 01028 | 63.000 |
63.000 |
$482.410 |
EACH | 0.8 |
| 0510 | CORED HOLE DRAINAGE BOX CON-4 INCH | 01740 | 22.000 |
22.000 |
$352.990 |
EACH | 0.2 |
| 0520 | DELINEATOR FOR BARRIER-YELLOW | 01985 | 40.000 |
40.000 |
$8.820 |
EACH | 0.0 |
| 0530 | BARRICADE-TYPE III | 02014 | 4.000 |
4.000 |
$274.110 |
EACH | 0.0 |
| 0540 | EMBANKMENT IN PLACE | 02230 | 1,420.000 |
1,420.000 |
$12.350 |
CUYD | 0.4 |
| 0550 | DITCHING | 02237 | 8,200.000 |
8,200.000 |
$4.120 |
LF | 0.8 |
| 0560 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 4,687.500 |
4,687.500 |
$18.350 |
LF | 2.2 |
| 0570 | GUARDRAIL END TREATMENT TYPE 2A | 02369 | 7.000 |
7.000 |
$941.250 |
EACH | 0.2 |
| 0580 | REMOVE GUARDRAIL | 02381 | 4,452.000 |
4,452.000 |
$2.350 |
LF | 0.3 |
| 0590 | GUARDRAIL END TREATMENT TYPE 4A | 02391 | 7.000 |
7.000 |
$2,176.650 |
EACH | 0.4 |
| 0600 | CHANNEL LINING CLASS II | 02483 | 2,420.000 |
2,420.000 |
$31.180 |
TON | 1.9 |
| 0610 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$116,661.630 |
LS | 2.9 |
| 0620 | SIGNS | 02562 | 2,456.000 |
2,456.000 |
$6.240 |
SQFT | 0.4 |
| 0630 | LANE CLOSURE | 02653 | 4.000 |
4.000 |
$547.660 |
EACH | 0.1 |
| 0640 | CROSSOVER | 02655 | 1.000 |
1.000 |
$57,717.340 |
LS | 1.4 |
| 0650 | VAR MESSAGE SIGN-PORT 3 LINE | 02671 | 2.000 |
2.000 |
$4,988.860 |
EACH | 0.3 |
| 0660 | TEMPORARY SILT FENCE | 02701 | 2,000.000 |
2,000.000 |
$2.590 |
LF | 0.1 |
| 0670 | SILT TRAP TYPE B | 02704 | 28.000 |
28.000 |
$235.320 |
EACH | 0.2 |
| 0680 | CLEAN SILT TRAP TYPE B | 02707 | 56.000 |
56.000 |
$52.950 |
EACH | 0.1 |
| 0690 | SILT TRAP TYPE C | 20496NS843 | 17.000 |
17.000 |
$247.090 |
EACH | 0.1 |
| 0700 | CLEAN SILT TRAP TYPE C | 20497NS843 | 34.000 |
34.000 |
$47.060 |
EACH | 0.0 |
| 0710 | CLEAN TEMPORARY SILT FENCE | 02709 | 4,000.000 |
4,000.000 |
$1.410 |
LF | 0.1 |
| 0720 | STAKING | 02726 | 1.000 |
1.000 |
$18,355.230 |
LS | 0.5 |
| 0730 | FLASHING ARROW | 02775 | 2.000 |
2.000 |
$3,738.870 |
EACH | 0.2 |
| 0740 | CRASH CUSHION TYPE VI-T | 02894 | 1.000 |
1.000 |
$9,412.540 |
EACH | 0.2 |
| 0750 | CONC BARR WALL TY 9T-INSTALL | 20190ES601 | 580.000 |
580.000 |
$20.590 |
LF | 0.3 |
| 0760 | SHOULDER RUMBLE STRIPS-SAWED | 20362ES403 | 47,950.000 |
47,950.000 |
$0.290 |
LF | 0.3 |
| 0770 | TUBULAR MARKERS | 03225 | 306.000 |
306.000 |
$32.360 |
EACH | 0.2 |
| 0780 | EROSION CONTROL BLANKET | 05950 | 31,967.000 |
31,967.000 |
$1.700 |
SQYD | 1.4 |
| 0790 | TEMP SEEDING AND PROTECTION | 05953 | 1,000.000 |
1,000.000 |
$0.350 |
SQYD | 0.0 |
| 0800 | TOPDRESSING FERTILIZER | 05966 | 5.000 |
5.000 |
$500.040 |
TON | 0.1 |
| 0810 | SEEDING AND PROTECTION | 05985 | 7,000.000 |
7,000.000 |
$0.530 |
SQYD | 0.1 |
| 0820 | FLEXIBLE DELINEATOR POST-W | 06417 | 44.000 |
44.000 |
$35.300 |
EACH | 0.0 |
| 0830 | FLEXIBLE DELINEATOR POST-Y | 06418 | 2.000 |
2.000 |
$35.300 |
EACH | 0.0 |
Category Total $3,806,458.14 |
| SM- Project | DE02490040526 | CATEGORY NUMBER | 0002 | CATEGORY Description | DEMOBILIZATION |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0840 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$60,832.140 |
LS | 1.5 |
| 0850 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$117,709.720 |
LS | 3.0 |
Category Total $178,541.86 |